Osun State Water Corporation

Water Projects Achievements

S/N Name of Project Completion Date Location/Local Government Development Objectives Status
1 Payment for electricity bill (Nov. 2022 till date) Jan – Feb, 2026 Statewide To ensure power supply to Waterworks for water production Completed
2 Procurement of Water Treatment Chemicals Jan, 2023 – Sep, 2025 Statewide To enhance potable water supply to the populace Completed
3 Rewinding of 650kw Osogbo High-lift pump control panel at New Ede Headworks June, 2023 Ede North To restore potable water supply to Osogbo township Completed
4 Replacement of 100mm AC pipeline with HDPE 110mm pipe (1160m) from Cottage Hospital junction to NYSC Camp, Ede June, 2023 Ede South To improve potable water supply to part of Ede South Completed
5 Repair/replacement of various diameters/sizes of pipes across Corporation’s Schemes July, 2023 Osogbo, Ede, Ile-Ife, Gbongan, Ikirun, Eko-Ende To restore potable water supply Completed
6 Replacement of iron rope and accessories of Dam gate No.2 at Owala Dam July, 2023 Egbedore To restore potable water supply and avoid flood Completed
7 Replacement of damaged AC pipelines at Gabriel Catholic School, Oke Baale, Osogbo 2024 Oke Baale, Osogbo To restore potable water supply Completed
8 Construction of sliding gate at Owalla Dam 2024 Owalla To protect and prevent unauthorized access Completed
9 Replacement of faulty electric motor panels on four High lift pumps at New Ede Headworks 2024 NEHW To improve potable water supply to Ede, Osogbo, Gbongan, Odeomu and Origbo Completed
10 Repair of transformer No.4 and purchase of transformer oil 2024 NEHW To access adequate power supply for water production Completed
11 Completion of replacement of faulty electric motor panels on four High lift pumps 2024 NEHW To restore potable water production Completed
12 Evacuation, repair/maintenance and sanitization of fresh 200m3 in 4 filter media at Iwo and Eko-Ende Waterworks 2024 Iwo and Eko-Ende To improve quality of potable water production Completed
13 Extension of 110mm diameter HDPE pipe Jan, 2025 Modakeke, Ile-Ife To restore potable water supply to Modakeke Completed
14 Bush clearing of OSWC reservoir premises Feb, 2025 Statewide To improve hygiene and security of facilities Completed
15 Installation of strainers on water meters Feb, 2025 BOWEN University Iwo, Adeleke University Ede, Army Barrack Ede To measure water consumption accurately Completed
16 Replacement of burnt 2.5MVA transformer cable and repair of RAYCHEM kit at Ede Headworks Feb, 2025 NEHW To ensure adequate power supply for water production Completed
17 Replacement of Vacuum pern VGA-117 with accessories at New Ede Headworks Feb, 2025 NEHW For adequate water treatment (disinfection) Completed
18 Revamping of Esa-Odo Water Scheme with electro-mechanical repairs Feb, 2025 Esa-Odo To restore potable water supply to towns under coverage Completed
Small Towns, Water Supply and Sanitation Agency (STOWASSA)
  1. Reconstruction and Rehabilitation of Ora-Igbomina Mini Water Scheme on going.
  2. Rehabilitation of Iree/Eripa Mini Water Scheme
  3. Rehabilitation of Dagbolu Mini Water Scheme
  4. Rehabilitation of Ilobu Mini Water Scheme
  5. Rehabilitation of Ipetu/Ijesa Mini Water Scheme
Osun State Water Regulatory Commission
  1. Acquisition of Tokunbo Hummer Bus
  2. Acquisition of solar power sources to both Main and ES offices.
  3. Acquisition of the Atomic Absorption Spectrophotometers (AAS) for water analysis
  4. Seven (7) Laptops and (7) Printers
  5. Renovation and Partition of the OSWRC’S office
  6. Furniture of the OSWRC’S offices
  7. Renovation of the Executive Secretary’s office
  8. Provision of furniture at the Executive Secretary’s office
  9. Provision of Televisions set
  10. Provision of Three (3) VIP toilets
  11. Two solar powered fans, one (1) electric powered fan