| 1 |
Payment for electricity bill (Nov. 2022 till date) |
Jan – Feb, 2026 |
Statewide |
To ensure power supply to Waterworks for water production |
Completed |
| 2 |
Procurement of Water Treatment Chemicals |
Jan, 2023 – Sep, 2025 |
Statewide |
To enhance potable water supply to the populace |
Completed |
| 3 |
Rewinding of 650kw Osogbo High-lift pump control panel at New Ede Headworks |
June, 2023 |
Ede North |
To restore potable water supply to Osogbo township |
Completed |
| 4 |
Replacement of 100mm AC pipeline with HDPE 110mm pipe (1160m) from Cottage Hospital junction to NYSC Camp, Ede |
June, 2023 |
Ede South |
To improve potable water supply to part of Ede South |
Completed |
| 5 |
Repair/replacement of various diameters/sizes of pipes across Corporation’s Schemes |
July, 2023 |
Osogbo, Ede, Ile-Ife, Gbongan, Ikirun, Eko-Ende |
To restore potable water supply |
Completed |
| 6 |
Replacement of iron rope and accessories of Dam gate No.2 at Owala Dam |
July, 2023 |
Egbedore |
To restore potable water supply and avoid flood |
Completed |
| 7 |
Replacement of damaged AC pipelines at Gabriel Catholic School, Oke Baale, Osogbo |
2024 |
Oke Baale, Osogbo |
To restore potable water supply |
Completed |
| 8 |
Construction of sliding gate at Owalla Dam |
2024 |
Owalla |
To protect and prevent unauthorized access |
Completed |
| 9 |
Replacement of faulty electric motor panels on four High lift pumps at New Ede Headworks |
2024 |
NEHW |
To improve potable water supply to Ede, Osogbo, Gbongan, Odeomu and Origbo |
Completed |
| 10 |
Repair of transformer No.4 and purchase of transformer oil |
2024 |
NEHW |
To access adequate power supply for water production |
Completed |
| 11 |
Completion of replacement of faulty electric motor panels on four High lift pumps |
2024 |
NEHW |
To restore potable water production |
Completed |
| 12 |
Evacuation, repair/maintenance and sanitization of fresh 200m3 in 4 filter media at Iwo and Eko-Ende Waterworks |
2024 |
Iwo and Eko-Ende |
To improve quality of potable water production |
Completed |
| 13 |
Extension of 110mm diameter HDPE pipe |
Jan, 2025 |
Modakeke, Ile-Ife |
To restore potable water supply to Modakeke |
Completed |
| 14 |
Bush clearing of OSWC reservoir premises |
Feb, 2025 |
Statewide |
To improve hygiene and security of facilities |
Completed |
| 15 |
Installation of strainers on water meters |
Feb, 2025 |
BOWEN University Iwo, Adeleke University Ede, Army Barrack Ede |
To measure water consumption accurately |
Completed |
| 16 |
Replacement of burnt 2.5MVA transformer cable and repair of RAYCHEM kit at Ede Headworks |
Feb, 2025 |
NEHW |
To ensure adequate power supply for water production |
Completed |
| 17 |
Replacement of Vacuum pern VGA-117 with accessories at New Ede Headworks |
Feb, 2025 |
NEHW |
For adequate water treatment (disinfection) |
Completed |
| 18 |
Revamping of Esa-Odo Water Scheme with electro-mechanical repairs |
Feb, 2025 |
Esa-Odo |
To restore potable water supply to towns under coverage |
Completed |